POE worked with SMART of Myanmar for  Myanmar Oil and Gas Enterprise (MOGE) to perform the following work:
1) Cleaning, gauging, hydro-testing and drying for 24 inch natural gas pipeline from PLC to Yangon Ywama Distribution Station.  The length is 140km;
2) Cleaning, hydro-testing and drying for 14 inch natural gas pipeline from Yangon Ywama Distribution Station to Shew Pyi Tha/ Hlawga, the length is 18km;
3) Cleaning, hydro-testing and drying for 8 inch natural gas pipeline from Igyi to Gyaung Waing, the length is 12km;
4) Issue procedure and report of cleaning, gauging, hydro-testing and drying.  64 documents are issued including 18 PMT Plan, 2 Procedures, 38 Construction Reports and 6 HSE Plan. The followings photos are taken in site during construction.